快跑搜题,海量国家开放大学和大学考试复习和大学网课题库。下面是我们为您分享的一道[单选题]:In which phase is the staff training development for Cisco Unified Communications planned()考试题目的答案,如果您在复习过程中遇到任何难题,只需关注快跑搜题公众号,发送您的问题,我们就会立即为您提供详尽的答案。
题目:In which phase is the staff training development for Cisco Unified Communications planned()
题型:[单选题]
A.esign
B.Implement
C.Plan
D.Prepare
参考答案:
查看更多题目答案请关注【快跑搜题】微信公众号,发送题目即可获取
更多“In which phase is the staff training development for Cisco Unified Communications planned()”相关的问题
第1题
What are we probably going to see and maybe already are experiencing?A.A new phase in th
What are we probably going to see and maybe already are experiencing?A.A new phase in the evolution of Information TechnologyB.A new direction of the development of ITC.A new quantitative and qualitative leap in the growth of dataD.A new attitude towards life
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第2题
●In which phase of the software engineering process is the Software Requirements Specifica
tion developed? (68) .(68) A.development phaseB.engineering phaseC.maintenance phaseD.Definition phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第3题
In Which phase of the software engineering process iS the Software Requirements Specificat
ion developed?A.definition phaseB.engineering phaseC.maintenance phaseD.development phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第4题
176The definitive terms of a contract are written during which of the following contract p
176 The definitive terms of a contract are written during which of the following contract phases? A. Contract PhaseB. Post-Award PhaseC. Award PhaseD. Pre-Award PhaseE. Requirement Phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第5题
Which phase of the software development requires the most development time?A.the design ph
Which phase of the software development requires the most development time?A.the design phaseB.the testing phaseC.the maintenance phaseD.the development phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第6题
94The definitive terms of a contract are written during which of the following contract ph
94 The definitive terms of a contract are written during which of the following contract phases? A. Contract PhaseB. Post-Award PhaseC. Award PhaseD. Pre-Award PhaseE. Requirement Phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第7题
In which phase is a systems acceptance test plan developed and documented? ()
A.Implement
B.Design
C.Prepare
D.Operate
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第8题
During which phase is a proposal developed and delivered? ()
A.Prepare
B.Plan
C.Design
D.Operate
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第9题
The definitive terms of a contract are written during which of the following contract phas
es?A Contract PhaseB Post-Award PhaseC Award PhaseD Pre-Award PhaseE Requirement Phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第10题
Feasibility studies occur in which life cycle phase (s)?A.ConceptualB.Conceptual or Develo
Feasibility studies occur in which life cycle phase (s)?A.ConceptualB.Conceptual or DevelopmentC.ExecutionD.Preliminary planningE.any life cycle phase
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
第11题
In which phase is a systems acceptance test plan developed and documented?()
A.Implement
B.Design
C.Prepare
D.Operate
参考答案:查看答案请关注【快跑搜题】微信公众号,发送题目即可获取
郑重声明:本文版权归原作者所有,转载文章仅为传播更多信息之目的,如作者信息标记有误,请第一时间联系我们修改或删除,多谢。